Portage Pea Project - Packaging & Storage Building

Portage la Prairie, MB


Client:
Wescan Construction Services

General Contractor:
Graham Construction

Project Value:
$8,000,000 (Estimate)

Project Delivery Method:
Design-Build

Engineering Services Provided:
Design Development, Final Design
Contract Administration

Project Completion:
2021

Roquette Canada constructed a new pea processing facility in support of manufacturing operations, located in Portage la Prairie. The facility included a packaging and and storage building which packaged finished product for distribution. The mechanical systems features a forced-air ventilation system, dust collection system, and vacuum system. Rooftop air handlers are utilized for ventilation and incorporates natural-gas heating and DX-cooling. The HVAC system operates with a building pressure control strategy to satisfy operating criteria.

The project size and complexity dictated a multi-disciplinary project team, and showcased our integrated design approach.

 


View More

Unite Interactive